JE Fuller was selected for the Rawhide Wash Flood Mitigation Final Design project

The Project is a partnership between the Flood Control District of Maricopa County, the City of Phoenix and the City of Scottsdale.  The Project includes design of a floodwall and levee system to contain the 100-year flood with freeboard within the Rawhide Wash from Jomax Road to Pinnacle Peak Road.