Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/jefuller/wp-includes/functions.php on line 6121
East Shea Area Drainage Master Plan • JE Fuller

East Shea Area Drainage Master Plan

Project Description

The East Shea Corridor Area Drainage Master Study (ADMS) is a regional drainage study conducted by the Flood Control District of Maricopa County, encompassing approximately 45 square miles in Scottsdale and Phoenix, Arizona. The watershed includes the steep slopes of the McDowell Mountains, which drain into highly urbanized areas. As a subconsultant, JE Fuller contributed to the study by developing updated hydrology and hydraulics (H&H) models using FLO-2D, incorporating culverts, 1D channels, property walls, and storm drain systems. Our team also assisted in identifying 18 flood-prone areas and formulating mitigation strategies, including Green Stormwater Infrastructure (GSI) and Low Impact Development (LID) alternatives where applicable. These efforts culminated in comprehensive mitigation area reports with alternative rankings and conceptual designs, aimed at enhancing flood protection for the communities within the study area.

Location

Scottsdale, AZ/Phoenix, AZ

Client

Flood Control District of Maricopa County/Wilson & Company, Inc.