Successful completion of engineering projects has become increasingly reliant upon the navigation of a complex regulatory framework to obtain necessary clearances and permits. JE Fuller’s professional staff has developed expertise and has gained experience in assisting our clients to obtain permits in a timely manner. A thorough understanding of regulatory and permit requirements informs the study or design process so that engineering products meet the basic permit requirements with the first submittal.
![Slide1 Slide1](https://www.jefuller.com/wp-content/uploads/2019/04/Slide1-1-1000x550.jpg)
The primary regulatory arenas served by JE Fuller are related to:
- Floodplain management regulations by the Federal Emergency Management Agency (FEMA).
- Clean Water Act permits (404 and 401) by the Regulatory branch of the U.S. Army Corps of Engineers.
- Storm Water Permits by the U.S. Environmental Protection Agency (EPA), which are implemented in Arizona by the Arizona Department of Environmental Quality (ADEQ).
- Permits for material extraction from watercourses from Sand and Gravel mining.