Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/jefuller/wp-includes/functions.php on line 6121
Dam Emergency Action Plans • JE Fuller

Dam Emergency Action Plans

Project Highlight: Dam Emergency Action Plans

Location

Maricopa County, Arizona

Client

Flood Control District of Maricopa County

Project Leads

Ted Lehman

Problem

  • Analyze and quantify potentially impacted areas
  • Characterize flood hazard types, locations, and lead times
  • Develop emergency action plan documentation for Maricopa County

Approach

  • Collect and evaluate existing hydrologic and hydraulic data and studies
  • Perform new one- and two-dimensional hydrologic and hydraulic analyses to identify affected areas
  • Coordinate with agency personnel

Solution

  • Communicate results in formats conforming to regulatory requirements
  • Provide clear documentation of analyses and results
  • Complete within budgets and schedules