Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/jefuller/wp-includes/functions.php on line 6121
Kingman - Fairgrounds • JE Fuller

Kingman – Fairgrounds

Project Description

  • JE Fuller served as the engineering consulting, analyzing and design and drainage solution for the City of Kingman for a known flooding region along Fairground Road. This solution was progressed through several plan revisions (30%, 60%, 90%, 100%). It was approved by the City of Kingman and should be constructed in 2020

Location

Mohave County, Arizona

Client

City of Kingman

Project Leads

Ian Sharp
Chris Rod
Cyrus Miller
Geoff Harris