Project Highlight: AGFD – Willow Spring Phs III
Location
Yavapai County, AZ
Client
Arizona Game and Fish Department
Project Leads
Ethan Rode
Tyler Azeltine
Scott Ogden
Brian Iserman
Jeffrey Despain
Problem
- The new principle outlet needed hydraulic controls.
- The lake could not be drained.
- The old controls were manual
Approach
- Hydraulic controls were designed and would be installed.
- Divers were hired to do the underwater work.
Solution
- The new hydraulic ram was installed.
- The new hydraulic controls and lines were installed.
- A protective cover and actuator house were installed.