Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the js_composer domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/jefuller/wp-includes/functions.php on line 6121
Dam & Levee Services :. JE Fuller

Dam & Levee Services

The purpose of Dam & Levee services is to maximize protection of human life and property against dam failure.  In order to meet this purpose, it is necessary to inspect, evaluate, repair, design, and monitor new and existing structures.  Developing action plans to successfully meet these requirements is also a critical tool.

Our staff has many years of combined and varied experience performing inspections, evaluations, and monitoring of existing structures.  JEF has also designed new structures as well as field designed many other aspects related to dams.  JEF also brings a unique value to the design process by using our expertise and understanding of hydrology, hydraulics, sedimentation and erosion, and applied geomorphology to develop functional, practical, and cost-effective flood control.  JEF is also a leader in the design, construction and maintenance of flood warning systems, data collection systems and two-way wireless controls associated with operating and monitoring dams.